This challenge is looking for propose a Temporary Factory for building solution to manufacture precast reinforced concrete structures
This challenge is looking for reducing the set-up times of the full rubber extrusion line with a reasonable investment in new tooling or equipment.
12/3/2015Mario Honrubia
For some processes,, it is crucial to accurate measure gas flows. These are 5 of the most popular technologies in the industry.
12/3/2015Mario Honrubia
Game-based learning is the new revolution. An engaging game can help understanding complex concepts. But what makes games engaging?
11/24/2015Mario Honrubia
The company is looking for effective measurements of the gas flow according to the changes in market demands. Take a look!
11/14/2015Mario Honrubia
TSOs are responsible for ensuring a reliable power system avoiding power outages that could have devastating consequences, even for the country’s GDP.
11/10/2015Mario Honrubia
In this blog we explain What are Smart Grids and Why they are emerging.
11/2/2015Mario Honrubia
Case study of EPC Projects: Big equipment Transportation in difficult access areas, cost overrun, and schedule delays. Take a look at the article here.
10/20/2015Mario Honrubia
This challenge is looking for innovative proposals to develop a game that will help to understand the role of a National Electricity Operator.
10/16/2015Mario Honrubia